600kVCC Emergency Restoration Systems

20/2/2021

Emergency towers model TET-1500 designed and manufactured by Seccional Brasil for the client IE Madeira were successfully used to reestablish the 3rd and 4th poles of the LT 600 kVCC from Norte Brasil NTBE utility company, that connects Porto Velho in the Brazilian Amazon Region to Araraquara in Sao Paulo State for over 2.300km (1430 miles), attending the structures falls due to the severe storms by late 2020.

Initially developed to attend the 600 kVCC bipoles, TET 1500 is also highly recommended for the 500 kVAC triphasic circuits. Congratulation for NBTE team for the great work!

© Copyright Seccional 2021. All rights reserved.